Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
pacificorp interconnection queue | 1.47 | 0.8 | 1568 | 61 | 32 |
pacificorp | 0.53 | 0.6 | 1406 | 7 | 10 |
interconnection | 0.64 | 1 | 6473 | 32 | 15 |
queue | 0.45 | 0.2 | 3498 | 70 | 5 |
Keyword | CPC | PCC | Volume | Score |
---|---|---|---|---|
pacificorp interconnection queue | 0.57 | 1 | 8271 | 58 |
pacificorp generation interconnection queue | 1.36 | 0.8 | 3092 | 58 |