Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
florida power and light interconnection queue | 0.9 | 0.1 | 667 | 6 | 45 |
florida | 0.84 | 0.9 | 2289 | 44 | 7 |
power | 1.29 | 0.7 | 2329 | 6 | 5 |
and | 0.44 | 0.4 | 1105 | 36 | 3 |
light | 1.96 | 0.9 | 7634 | 11 | 5 |
interconnection | 1.66 | 0.7 | 5668 | 10 | 15 |
queue | 1.84 | 0.2 | 8982 | 73 | 5 |